We commissioned Paul Webb from B2B Energy Ltd to carry out a detailed study and a tender for Valor Hospitality Europe to take steps forward to become ‘Energy Resilient’. He has guided our organisation through the risks and benefits of implementing a 12 Hotel CHP programme which is now coming to an end.
The project has been impacted by the COVID 19 lockdown but Paul has collaborated with our technical services team and the supplier to ensure that the project has been delivered as soon as practically possible. Due to his professionalism and attitude, the project is coming on-line with his team monitoring the systems, on a real-time basis, ensuring they are maintaining and at times exceeding, the design savings originally proposed.